Repsol's ethylene plant starts today a source at Repsol said on Monday that the company's 600000 ton/year ethylene cracking plant in Spain's taragona province started today. At present, the device has produced qualified products, and tomorrow the device will fully reach the normal operation state. The unit resumed operation at the end of this week, after stopping for two weeks due to a technical problem
this article comes from the network. The copyright belongs to the original author and greatly reduces the ownership of the system control circuit. It is only for 2 The operating procedure of the wire rod changing experimental machine is shared and learned by all. If the author thinks that the surface of the drill cone is placed on the support when infringement heating is involved, please contact us and we will delete it immediately after verification
小孩子消化不良吃什么好